Within the scope of an extensive retrofit programme, at Lammsbräu the process of malt kiln was completely equipped with new hardware, the wiring diagram and the software were revised and several plants were connected to the existing control system.
Read in:
Deutsch
Deutsch
With the help of EPLAN we have combined the old documents of the drying plant and conveyor plant, newly built up and digitised them.
The programming and the user interface of the touch panel was chosen in a way that the functionality was increased, and a finer setting of the programmes was enabled.
In addition to the new control cabinet for the control Siemens S7-1200, on-site control boxes were installed.
The extended retrofit makes it possible to connect the drying chamber and the conveyor belts to the control system which already controls the other plants of the malthouse.