The wastewater that is generated during the production processes in a dairy must be treated in several steps. With this project we took over the automation of the control systems as well as the complete electrical installation.
Read in:
Deutsch
Deutsch
We were commissioned with the construction of the control cabinets and the programming, cabling and start-up for the enlargement of the sewage treatment plant of a large dairy.
Our control systems provide a professional control of the sewage treatment plant and cooling plants. Besides the assembly and the cabling of the switch units, three PLCs were programmed and integrated in the existing and established control system of the customer.
By the SCADA system, the plants are directly
controlled by touch displays in the production rooms or by the control centre.
To continuously ensure the high quality of execution, we took over the complete electrical installation of the plants.